Refine
Document Type
Language
- English (3)
Has Fulltext
- yes (3)
Is part of the Bibliography
- no (3) (remove)
Institute
- Physik (3) (remove)
Challenges of FAIR phase 0
(2018)
After two-year's shutdown, the GSI accelerators plus the latest addition of storage ring CRYRING, will be back into operation in 2018 as the FAIR phase 0 with the goal to fulfill the needs of scientific community and the FAIR accelerators and detector development. Even though GSI has been well known for its operation of a variety of ion beams ranging from proton up to uranium for multi research areas such as nuclear physics, astrophysics, biophysics, material science, the upcoming beam time faces a number of challenges in re-commissioning its existing circular accelerators with brand new control system and upgrade of beam instrumentations, as well as in rising failures of dated components and systems. The cycling synchrotron SIS18 has been undergoing a set of upgrade measures for fulfilling future FAIR operation, among which many measures will also be commissioned during the upcoming beam time. This paper presents the highlights of the challenges such as re-establishing the high intensity heavy ion operation as well as parallel operation mode for serving multi users. The status of preparation including commissioning results will also be reported.
An automated beam-setting optimization application has been implemented on top of FAIR’s control system software stack based on CERN’s LSA framework. The optimization functionality is built using the Jenetics software library implemented in Java. Tests of the software with beam have been performed at the CRYRING@ESR ion storage ring.
GSI High Energy Beam Transfer lines (HEST) link the SIS18 synchrotron with two storage rings (Experimental Storage Ring and Cryring) and six experimental caves. The recent upgrades to HEST beam instrumentation enables precise measurements of beam properties along the lines and allow for faster and more precise beams setup on targets. Preliminary results of some of the measurements performed during runs in 2018 and 2019 are presented here. The focus is on response matrix measurements and quadrupole scans performed on HADES beam line. The errors and future improvements are discussed.