The upcoming commissioning of the superconducting (SC) continuous wave Helmholtz linear accelerators first of series cryomodule is going to demand precise alignment of the four internal SC cavities and two SC solenoids. For optimal results, a beam-based alignment method is used to reduce the misalignment of the whole cryomodule, as well as its individual components. A symmetric beam of low transverse emittance is required for this method, which is to be formed by a collimation system. It consists of two separate plates with milled slits, aligned in the horizontal and vertical direction. The collimation system and alignment measurements are proposed, investigated, and realized. The complete setup of this system and its integration into the existing environment at the GSI High Charge State Injector are presented, as well as the results of the recent reference measurements.
Recently the Universal Linear Accelerator (UNILAC) serves as a powerful high duty factor (25%) heavy ion beam accelerator for the ambitious experiment program at GSI. Beam time availability for SHE (Super Heavy Element)-research will be decreased due to the limitation of the UNILAC providing Uranium beams with an extremely high peak current for FAIR simultaneously. To keep the GSI-SHE program competitive on a high level and even beyond, a standalone superconducting continuous wave (100% duty factor) LINAC in combination with the upgraded GSI High Charge State injector is envisaged. In preparation for this, the first LINAC section (financed by HIM and GSI) will be tested with beam in 2017, demonstrating the future experimental capabilities. Further on the construction of an extended cryo module comprising two shorter Crossbar-H cavities is foreseen to test until end of 2017. As a final R&D step towards an entire LINAC three advanced cryo modules, each comprising two CH cavities, should be built until 2019, serving for first user experiments at the Coulomb barrier.
Since the last 20 years, modern heuristic algorithms and machine learning have been increasingly used for several purposes in accelerator technology and physics. Since computing power has become less and less of a limiting factor, these tools have become part of the physicist community's standard toolkit [1][2] [3] [4] [5]. This paper describes the construction of an algorithm that can be used to generate an optimised lattice design for transfer lines under the consideration of restrictions that usually limit design options in reality. The developed algorithm has been applied to the existing SIS18 to HADES transfer line in GSI.
The new heavy ion superconducting continuous wave HElmholtz LInear ACcelerator (HELIAC) is under construction at GSI. A normal conducting injector, comprising an ECR ion source, an RFQ and a DTL, is recently in development. The new Interdigital H-mode DTL, presented in this paper, accelerates the heavy ion beam from 300 to 1400 keV/u, applying an Alternating Phase Focusing (APF) beam dynamics scheme. This APF section, consisting of two separately controlled tanks, has to provide for stable routine operation with assistance of dedicated beam diagnostics devices in the Intertank section. The installed quadrupole lenses and beam steerers installed there ensure full transmission in a wide range of input beam parameters.
The ARMADILLO bunch compressor currently being designed at IAP is capable of reaching a longitudinal pulse compression ratio of 45 for proton beams of 150 mA at 2 MeV. It will provide one nanosecond proton pulses with a peak current of 7.7 A. The system guides nine linacμbunches deflected by a 5 MHz rf kicker and uses four dipole magnets - two homogeneous and two with field gradients - to merge them on the target. For longitudinal focusing and an energy variation of ±200 keV two multitrack rf cavities are included. ARMADILLO will be installed at the end of the Frankfurt Neutron Source FRANZ making use of the unique 250 kHz time structure. This contribution will provide an overview of the layout of the system as well as recent advances in component design and beam dynamics of the compressor.
MYRRHA is conceived as an accelerator driven system (ADS) for transmutation of high level nuclear waste. The neutron source is created by coupling a proton accelerator of 600 MeV with a 4 mA proton beam, a spallation source and a sub-critical core. The IAP of Frankfurt University is responsible for the development of the 17 MeV injector operated at 176 MHz. The injector consists of a 1.5 MeV 4-Rod-RFQ and six CH-drifttube-structures. The first two CH-structures will be operated at room temperature and the other CH-structures are superconducting cavities assembled in one cryo-module. To achieve the extremely high reliability required by the ADS application, the design of the 17 MeV injector has been intensively studied, with respect to thermal issues, minimum peak fields and field distribution.
The crossbar H-mode (CH) cavity is an accelerating structure operated in the H21(0) mode. The robustness of the crossbar geometry allows one to realize room temperature as well as superconducting linac cavities. The shunt impedance characteristics of this structure are attractive to develop proton and heavy ion linacs in the low and medium beta range. A first room temperature eight-cell prototype has proven the feasibility of the crossbar design in terms of mechanical construction, copper plating, and cooling. An innovative rf coupling concept has been developed where two CH cavities are connected by a two gap E010-mode resonator which, at the same time, provides transverse focusing by a quadrupole triplet. The concept has been applied in the design of the new FAIR proton linac and a scaled model of the second cavity of this injector has been built and tested too. The full scale prototype is now under construction at the University of Frankfurt. In this paper, the room temperature CH cavity development as well as the general layout of the FAIR proton injector (70 MeV, 325 MHz, 70 mA) is presented and discussed.
The crossbar-H-mode (CH) structure is the first superconducting multicell drift tube cavity for the low and medium energy range operated in the H21 mode. Because of the large energy gain per cavity, which leads to high real estate gradients, it is an excellent candidate for the efficient acceleration in high power proton and ion accelerators with fixed velocity profile. A prototype cavity has been developed and tested successfully with a gradient of 7MV/m. A few new superconducting CH cavities with improved geometries for different high power applications are under development at present. One cavity (f=325 MHz, β=0.16, seven cells) is currently under construction and studied with respect to a possible upgrade option for the GSI UNILAC. Another cavity (f=217 MHz, β=0.059, 15 cells) is designed for a cw operated energy variable heavy ion linac application. Furthermore, the EUROTRANS project (European research program for the transmutation of high level nuclear waste in an accelerator driven system, 600 MeV protons, 352 MHz) is one of many possible applications for this kind of superconducting rf cavity. In this context a layout of the 17 MeV EUROTRANS injector containing four superconducting CH cavities was proposed by the Institute for Applied Physics (IAP) Frankfurt. The status of the cavity development related to the EUROTRANS injector is presented.
For the research program with cooled antiprotons at FAIR a dedicated 70 MeV, 70 mA proton injector is required. The main acceleration of this room temperature linac will be provided by six CH cavities operated at 325 MHz. Each cavity will be powered by a 2.5 MW Klystron. For the second acceleration unit from 11.5 MeV to 24.2 MeV a 1:2 scaled model has been built. Low level RF measurements have been performed to determine the main parameters and to prove the concept of coupled CH cavities. For this second tank technical and mechanical investigations have been performed in 2010 to develop a complete technical concept for the manufacturing. In Spring 2011, the construction of the first power prototype has started. The main components of this cavity will be ready for measurements in summer 2011. At that time, the cavity will be tested with a preliminary aluminum drift tube structure, which will allow precise frequency and field tuning. This paper will report on the recent technical development and achievements. It will outline the main fabrication steps towards that novel type of proton DTL. Also first low level RF measurements are expected.