Refine
Year of publication
- 2011 (2) (remove)
Document Type
Language
- English (2)
Has Fulltext
- yes (2)
Is part of the Bibliography
- no (2)
Institute
- Physik (2)
The Frankfurt Neutron Source at the Stern-Gerlach-Zentrum is driven by a 2 MeV proton linac consisting of a 4-rod-radio-frequency-quadrupol (RFQ) and an 8 gap IH-DTL structure. RFQ and IH cavity will be powered by only one radio frequency (RF) amplifier to reduce costs. The RF-amplifier of the RFQ-IH combination is coupled into the RFQ. Internal inductive coupling along the axis connects the RFQ with the IH cavity ensuring the required power transition as well as a fixed phase relation between the two structures. The main acceleration of 120 keV up to 2.03 MeV will be reached by the RFQ-IH combination with 175 MHz and at a total length of 2.3 m. The losses in the RFQ-IH combination are about 200 kW.
This novel kind of neutron beam facility will provide 1 ns short neutron pulses with an approximately thermal energy distribution around 30 keV. The pulse repetition rate will be up to 250 kHz, the total proton number per pulse will be up to 6×1010 in the final stage, starting with a p – source current of 200 mA. A second target station will allow n – activation experiments by cw beam operation. An intense 2 MeV proton beam will drive a neutron source by the 7 Li (p,n) 7 Be reaction. The facility is under construction at the physics experimental hall of the J.W. Goethe – University. The 1m thick concrete tunnel was installed in 2009. In 2011 all rf amplifiers will be delivered and installed. Successful 200 mA proton source experiments in 2010 at a test stand will be followed by experiments on the 120 kV FRANZ terminal in 2011. The 250 kHz, 100 ns chopper in front of the rf linac is under construction, while the 2 MeV bunch compressor design was finished and the technical design of all components has started. The main accelerator cavity is under construction. First 2 MeV beam tests are expected for end of 2012.