Refine
Year of publication
- 2011 (2)
Document Type
Language
- English (2)
Has Fulltext
- yes (2)
Is part of the Bibliography
- no (2)
Institute
- Physik (2)
n order to reach the desired intensities of heavy ion beams for the experiments at FAIR, SIS18 and SIS100 have to be operated with intermediate charge states. Operation with intermediate charge state heavy ions at the intensity level of about 1011 ions per cycle has never been demonstrated elsewhere and requires a dedicated upgrade program for SIS18 and a dedicated machine design for SIS100. The specific problems coming along with the intermediate charge state operation in terms of charge exchange processes at collisions with residual gas atoms, pressure bumps by ion induced desorption and corresponding beam loss appears far below the typical space charge limits. Thus, new design concepts and new technical equipment addressing these issues are developed and realized with highest priority. The upgrade program of SIS18 addressing the goal of minimum ionization beam loss and stable residual gas pressure conditions has been defined in 2005. A major part of this upgrade program has been successfully realized, with the result of a world record in accelerated number of intermediate charge state heavy ions.
SIS100 is the main synchrotron of the FAIR project. It is designed to accelerate high intensity intermediate charge state uranium beams from 200 MeV/u up to 2.7 GeV/u. Intermediate charge state heavy ions are exposed to a high probability of charge exchange due to collisions with residual gas molecules. Since the charge exchange process changes the magnetic rigidity, the involved ions are lost behind dispersive elements, and an energy-dependent gas desorption takes place. The StrahlSim code has been used to predict the stability of the residual gas pressure in SIS100 under beam loss driven dynamic conditions. The results show, that a stable operation at highest U28+ intensities is possible, under the constraint that the vacuum chambers of the ion catcher system are cold enough to pump hydrogen. Furthermore, in order to determine the load to the cryogenic system, the average beam energy deposition onto the ion catcher system has been calculated.