Refine
Document Type
- Article (1)
- Conference Proceeding (1)
Language
- English (2)
Has Fulltext
- yes (2)
Is part of the Bibliography
- no (2)
Institute
- Physik (2)
HADES is a fixed target experiment using SIS18 heavy-ion beams. It investigates the microscopic properties of matter formed in heavy-ion, proton and pion - induced reactions in the 1-3.5 GeV/u energy regime. In 2014 HADES used a secondary pion beam produced by interaction between high-intensity nitrogen primary beam and a beryllium target. In these conditions beam losses, generated by slow extraction and beam transport to the experimental area, led to activation of the beam line elements and triggered radiation alarms. The primary beam intensity had to be reduced and the beam optics modified in order to keep radiation levels within the allowed limits. Similar beam conditions are requested by HADES experiment for upcoming run in 2018 and in the following years. Therefore, a number of measures have been proposed to improve beam transmission and quality. These measures are: additional shielding, additional beam instrumentation, modification of beam optics and increase of vacuum chambers' apertures in critical locations. The optics study and preliminary results of FLUKA simulations for optimization of location of loss detectors are presented.
Challenges of FAIR phase 0
(2018)
After two-year's shutdown, the GSI accelerators plus the latest addition of storage ring CRYRING, will be back into operation in 2018 as the FAIR phase 0 with the goal to fulfill the needs of scientific community and the FAIR accelerators and detector development. Even though GSI has been well known for its operation of a variety of ion beams ranging from proton up to uranium for multi research areas such as nuclear physics, astrophysics, biophysics, material science, the upcoming beam time faces a number of challenges in re-commissioning its existing circular accelerators with brand new control system and upgrade of beam instrumentations, as well as in rising failures of dated components and systems. The cycling synchrotron SIS18 has been undergoing a set of upgrade measures for fulfilling future FAIR operation, among which many measures will also be commissioned during the upcoming beam time. This paper presents the highlights of the challenges such as re-establishing the high intensity heavy ion operation as well as parallel operation mode for serving multi users. The status of preparation including commissioning results will also be reported.