Refine
Document Type
- Conference Proceeding (23)
- Article (8)
Language
- English (31)
Has Fulltext
- yes (31)
Is part of the Bibliography
- no (31)
Keywords
- 4-ROD RFQ (1)
- Fringe field (1)
- Gap field (1)
- Ladder-RFQ (1)
- RFQ (1)
- cyclotron (1)
- injection (1)
- rfq (1)
- simulation (1)
- target (1)
Institute
- Physik (31)
Superconducting, energy variable heavy ion linac with constant
β, multicell cavities of CH-type
(2009)
An energy variable ion linac consisting of multigap, constant-β cavities was developed. The effect of phase sliding, unavoidable in any constant-β section, is leading to a coherent rf phase motion, which fits well to the H-type structures with their long π-mode sections and separated lenses. The exact periodicity of the cell lengths within each cavity results in technical advantages, such as higher calculation accuracy when only one single period can be simulated, simpler manufacturing, and tuning. This is most important in the case of superconducting cavities. By using this concept, an improved design for a 217 MHz cw superconducting heavy ion linac with energy variation has been worked out. The small output energy spread of ± 3 AkeV is provided over the whole range of energy variation from 3.5 to 7.3 AMeV. These capabilities would allow for a competitive research in the field of radiochemistry and for a production of super heavy elements (SHE), especially. A first 19-cell cavity of that type was designed, built, and rf tested successfully at the Institute for Applied Physics (IAP) Frankfurt. A 325.224 MHz, seven-cell cavity with constant β = 0.16 is under development and will be operated in a frequency controlled mode. It will be equipped with a power coupler and beam tests with Unilac beams at GSI are foreseen.
The crossbar-H-mode (CH) structure is the first superconducting multicell drift tube cavity for the low and medium energy range operated in the H21 mode. Because of the large energy gain per cavity, which leads to high real estate gradients, it is an excellent candidate for the efficient acceleration in high power proton and ion accelerators with fixed velocity profile. A prototype cavity has been developed and tested successfully with a gradient of 7MV/m. A few new superconducting CH cavities with improved geometries for different high power applications are under development at present. One cavity (f=325 MHz, β=0.16, seven cells) is currently under construction and studied with respect to a possible upgrade option for the GSI UNILAC. Another cavity (f=217 MHz, β=0.059, 15 cells) is designed for a cw operated energy variable heavy ion linac application. Furthermore, the EUROTRANS project (European research program for the transmutation of high level nuclear waste in an accelerator driven system, 600 MeV protons, 352 MHz) is one of many possible applications for this kind of superconducting rf cavity. In this context a layout of the 17 MeV EUROTRANS injector containing four superconducting CH cavities was proposed by the Institute for Applied Physics (IAP) Frankfurt. The status of the cavity development related to the EUROTRANS injector is presented.
EUROTRANS is a European research program for the transmutation of high level nuclear waste in an accelerator-driven system (ADS). As proposed, the driver linac needs to deliver a 2.5–4 mA, 600 MeV continuous-wave (CW) proton beam and later a 20 mA, 800 MeV one to the spallation target in the prototype-scale and industrial-scale demonstration phases, respectively. This paper is focusing on the conceptual studies performed with respect to the 17 MeV injector. First, the special beam dynamics strategies and methods, which have been developed and applied to design a current-variable injector up to 30 mA for allowing an easy upgrade without additional R&D costs, will be introduced. Then the error study made for evaluating the tolerance limits of the designed injector will be presented as well.
Chromatic, geometric and space charge effects on laser accelerated protons focused by a solenoid
(2011)
We studied numerically emittance and transmission effects by chromatic and geometric aberrations, with and without space charge, for a proton beam behind a solenoid in the laser proton experiment LIGHT at GSI. The TraceWin code was employed using a field map for the solenoid and an initial distribution with exponential energy dependence close to the experiment. The results show a strong effect of chromatic, and a relatively weak one of geometric aberrations as well as dependence of proton transmission on distance from the solenoid. The chromatic effect has an energy filtering property due to the finite radius beam pipe. Furthermore, a relatively modest dependence of transmission on space charge is found for p production intensity below 1011.
The SIS300 synchrotron, planned for the new Facility for Antiproton and Ion Research (FAIR) at GSI-Darmstadt, will become the first superconducting synchrotron worldwide using cos(θ) magnets for resonant slow extraction. A multi-objective optimization algorithm has been developed for the design of the non-linear magnet scheme. The optimization algorithm makes use of the analytical model for the slow extraction from Kobayashi, the analytical description of the resonance excitation and amplitude-dependent tune-shift from Bengtsson, and corrects the chromaticity in order to fulfill the Hardt condition. As a result, the placement of the chromatic and harmonic sextupole magnets in SIS300, the number of sextupole families and the gradients of these families have been optimized for a high efficiency slow extraction. The algorithm accounts also for the sextupole errors on the dipole magnets, compensating its effects. Furthermore, optimized time-dependent settings for the sextupole magnets are generated to compensate the persistent current decay occurring at slow extraction. Tolerances for the magnets are set for the limits where the compensation is no longer valid.
SIS100 is the main synchrotron of the FAIR project. It is designed to accelerate high intensity intermediate charge state uranium beams from 200 MeV/u up to 2.7 GeV/u. Intermediate charge state heavy ions are exposed to a high probability of charge exchange due to collisions with residual gas molecules. Since the charge exchange process changes the magnetic rigidity, the involved ions are lost behind dispersive elements, and an energy-dependent gas desorption takes place. The StrahlSim code has been used to predict the stability of the residual gas pressure in SIS100 under beam loss driven dynamic conditions. The results show, that a stable operation at highest U28+ intensities is possible, under the constraint that the vacuum chambers of the ion catcher system are cold enough to pump hydrogen. Furthermore, in order to determine the load to the cryogenic system, the average beam energy deposition onto the ion catcher system has been calculated.
For the research program with cooled antiprotons at FAIR a dedicated 70 MeV, 70 mA proton injector is required. The main acceleration of this room temperature linac will be provided by six CH cavities operated at 325 MHz. Each cavity will be powered by a 2.5 MW Klystron. For the second acceleration unit from 11.5 MeV to 24.2 MeV a 1:2 scaled model has been built. Low level RF measurements have been performed to determine the main parameters and to prove the concept of coupled CH cavities. For this second tank technical and mechanical investigations have been performed in 2010 to develop a complete technical concept for the manufacturing. In Spring 2011, the construction of the first power prototype has started. The main components of this cavity will be ready for measurements in summer 2011. At that time, the cavity will be tested with a preliminary aluminum drift tube structure, which will allow precise frequency and field tuning. This paper will report on the recent technical development and achievements. It will outline the main fabrication steps towards that novel type of proton DTL. Also first low level RF measurements are expected.
As the successor of the EUROTRANS project, the MAX project is aiming to continue the R&D effects for a European Accelerator-Driven System and to bring the conceptual design to reality. The layout of the driver linac for MAX will follow the reference design made for the XT-ADS phase of the EUROTRANS project. For the injector part, new design strategies and approaches, e.g. half resonant frequency, half transition-energy between the RFQ and the CH-DTL, and using the 4-rod RFQ structure instead of the originally proposed 4-vane RFQ, have been conceived and studied to reach a more reliable CW operation at reduced costs. In this paper, the design and simulation results of the MAX injector are presented.
The MYRRHA Project (Multi Purpose Hybrid Reactor for High Tech Applications) at Mol/belgium will be a user facility with emphasis on research with neutron generated by a spallation source. One main aspect is the demonstration of nuclear waste technology using an accelerator driven system. A superconducting linac delivers a 4 mA, 600 MeV proton beam. The first accelerating section is covered by the 17 MeV injector. It consists of a proton source, an RFQ, two room temperature CH cavities and 4 superconducting CH-cavities. The initial design has used an RF frequency of 352 MHz. Recently the frequency of the injector has been set to 176 MHz. The main reason is the possible use of a 4-rod-RFQ with reduced power dissipation and energy, respectively. The status of the overall injector layout including cavity design is presented.
A modern linear accelerator of ions is a long chain of different accelerating-focusing structures. The design of new linacs, as well as an upgrade and optimization of operating facilities, requires precise and reliable beam matching with the subsequent sections. Proper matching of the beam to the channel allows to improve the performance of the whole linac and to reduce the specific costs. Additionally it helps to avoide particle loss in high energy high intensity linacs. Generally a matching algorithm combines precisely measured or calculated accelerating-focusing external fields and experimentally obtained details of the beam parameters with an advanced code for beam dynamics simulations including space charge effects. Experimental results are introduced into a code as input data. The described algorithm has already been successfully implemented for several GSI projects: an upgrade of the GSI heavy ion linac UNILAC, an ion linac for the cancer therapy, the proton linac for the FAIR facility, a facility for laser acceleration of ions and others. Measured data and results of beam dynamics simulations leading to an achieved improvement of the linac performance are presented.