Refine
Year of publication
- 2011 (12) (remove)
Document Type
- Conference Proceeding (10)
- Article (2)
Has Fulltext
- yes (12)
Is part of the Bibliography
- no (12)
Institute
- Physik (12)
This novel kind of neutron beam facility will provide 1 ns short neutron pulses with an approximately thermal energy distribution around 30 keV. The pulse repetition rate will be up to 250 kHz, the total proton number per pulse will be up to 6×1010 in the final stage, starting with a p – source current of 200 mA. A second target station will allow n – activation experiments by cw beam operation. An intense 2 MeV proton beam will drive a neutron source by the 7 Li (p,n) 7 Be reaction. The facility is under construction at the physics experimental hall of the J.W. Goethe – University. The 1m thick concrete tunnel was installed in 2009. In 2011 all rf amplifiers will be delivered and installed. Successful 200 mA proton source experiments in 2010 at a test stand will be followed by experiments on the 120 kV FRANZ terminal in 2011. The 250 kHz, 100 ns chopper in front of the rf linac is under construction, while the 2 MeV bunch compressor design was finished and the technical design of all components has started. The main accelerator cavity is under construction. First 2 MeV beam tests are expected for end of 2012.
For the research program with cooled antiprotons at FAIR a dedicated 70 MeV, 70 mA proton injector is required. The main acceleration of this room temperature linac will be provided by six CH cavities operated at 325 MHz. Each cavity will be powered by a 2.5 MW Klystron. For the second acceleration unit from 11.5 MeV to 24.2 MeV a 1:2 scaled model has been built. Low level RF measurements have been performed to determine the main parameters and to prove the concept of coupled CH cavities. For this second tank technical and mechanical investigations have been performed in 2010 to develop a complete technical concept for the manufacturing. In Spring 2011, the construction of the first power prototype has started. The main components of this cavity will be ready for measurements in summer 2011. At that time, the cavity will be tested with a preliminary aluminum drift tube structure, which will allow precise frequency and field tuning. This paper will report on the recent technical development and achievements. It will outline the main fabrication steps towards that novel type of proton DTL. Also first low level RF measurements are expected.