Refine
Year of publication
Document Type
- Conference Proceeding (1713) (remove)
Language
Keywords
- Germanistik (54)
- Japanisch (33)
- Bologna-Prozess (32)
- Exzellenzinitiative (32)
- Theorie (32)
- Zukunft (32)
- Koreanisch (30)
- Informationsstruktur (29)
- Deutsch (24)
- Computerlinguistik (23)
Institute
- Physik (249)
- Medizin (197)
- Rechtswissenschaft (119)
- Universitätsbibliothek (98)
- Extern (71)
- Informatik (41)
- Geschichtswissenschaften (31)
- Gesellschaftswissenschaften (30)
- Frankfurt Institute for Advanced Studies (FIAS) (27)
- Erziehungswissenschaften (25)
An optimized design of a stellarator-type storage ring for low energy ion beams was numerically investigated. The magnetic field variation along the circumference and therefore magnetic heating is suppressed by using simple circular correction coils. Particle-in-Cell (PIC) simulations in a magnetic flux coordinate system show the ability of high current ion beam accumulation in such a configuration with unique features for clockwise and anticlockwise moving beams. Additionally scaled down experiments with two 30 degree room temperature toroidal segments were performed to demonstrate toroidal transport and to develop optical beam diagnostics. Properties of multi-component beams, redistribution of transversal momenta in the non-adiabatic part of the experimental configuration and investigation of strongly confined beam induced electron clouds will be addressed.
For the research program with cooled antiprotons at FAIR a dedicated 70 MeV, 70 mA proton injector is required. The main acceleration of this room temperature linac will be provided by six CH cavities operated at 325 MHz. Each cavity will be powered by a 2.5 MW Klystron. For the second acceleration unit from 11.5 MeV to 24.2 MeV a 1:2 scaled model has been built. Low level RF measurements have been performed to determine the main parameters and to prove the concept of coupled CH cavities. For this second tank technical and mechanical investigations have been performed in 2010 to develop a complete technical concept for the manufacturing. In Spring 2011, the construction of the first power prototype has started. The main components of this cavity will be ready for measurements in summer 2011. At that time, the cavity will be tested with a preliminary aluminum drift tube structure, which will allow precise frequency and field tuning. This paper will report on the recent technical development and achievements. It will outline the main fabrication steps towards that novel type of proton DTL. Also first low level RF measurements are expected.
The MYRRHA Project (Multi Purpose Hybrid Reactor for High Tech Applications) at Mol/belgium will be a user facility with emphasis on research with neutron generated by a spallation source. One main aspect is the demonstration of nuclear waste technology using an accelerator driven system. A superconducting linac delivers a 4 mA, 600 MeV proton beam. The first accelerating section is covered by the 17 MeV injector. It consists of a proton source, an RFQ, two room temperature CH cavities and 4 superconducting CH-cavities. The initial design has used an RF frequency of 352 MHz. Recently the frequency of the injector has been set to 176 MHz. The main reason is the possible use of a 4-rod-RFQ with reduced power dissipation and energy, respectively. The status of the overall injector layout including cavity design is presented.
SIS100 is the main synchrotron of the FAIR project. It is designed to accelerate high intensity intermediate charge state uranium beams from 200 MeV/u up to 2.7 GeV/u. Intermediate charge state heavy ions are exposed to a high probability of charge exchange due to collisions with residual gas molecules. Since the charge exchange process changes the magnetic rigidity, the involved ions are lost behind dispersive elements, and an energy-dependent gas desorption takes place. The StrahlSim code has been used to predict the stability of the residual gas pressure in SIS100 under beam loss driven dynamic conditions. The results show, that a stable operation at highest U28+ intensities is possible, under the constraint that the vacuum chambers of the ion catcher system are cold enough to pump hydrogen. Furthermore, in order to determine the load to the cryogenic system, the average beam energy deposition onto the ion catcher system has been calculated.
The ARMADILLO bunch compressor currently being designed at IAP is capable of reaching a longitudinal pulse compression ratio of 45 for proton beams of 150 mA at 2 MeV. It will provide one nanosecond proton pulses with a peak current of 7.7 A. The system guides nine linacμbunches deflected by a 5 MHz rf kicker and uses four dipole magnets - two homogeneous and two with field gradients - to merge them on the target. For longitudinal focusing and an energy variation of ±200 keV two multitrack rf cavities are included. ARMADILLO will be installed at the end of the Frankfurt Neutron Source FRANZ making use of the unique 250 kHz time structure. This contribution will provide an overview of the layout of the system as well as recent advances in component design and beam dynamics of the compressor.
At the Institute for Applied Physics (IAP), University of Frankfurt, a s.c. 325 MHz CH-Cavity is under development for future beam tests at GSI UNILAC, Darmstadt. The cavity with 7 accelerating cells has a geometrical beta of 0.15 corresponding to 11.4 AMeV. The design gradient is 5 MV/m. The geometry of this resonator was optimized with respect to a compact design, low peak fields, surface processing, power coupling and tuning. Furthermore a new tuning system based on bellow tuners inside the resonator will control the frequency during operation. After rf tests in Frankfurt the cavity will be tested with a 10 mA, 11.4 AMeV beam delivered by the GSI UNILAC. In this paper rf simulations, multipacting analysis as well as thermal calculations will be presented.
The SIS300 synchrotron, planned for the new Facility for Antiproton and Ion Research (FAIR) at GSI-Darmstadt, will become the first superconducting synchrotron worldwide using cos(θ) magnets for resonant slow extraction. A multi-objective optimization algorithm has been developed for the design of the non-linear magnet scheme. The optimization algorithm makes use of the analytical model for the slow extraction from Kobayashi, the analytical description of the resonance excitation and amplitude-dependent tune-shift from Bengtsson, and corrects the chromaticity in order to fulfill the Hardt condition. As a result, the placement of the chromatic and harmonic sextupole magnets in SIS300, the number of sextupole families and the gradients of these families have been optimized for a high efficiency slow extraction. The algorithm accounts also for the sextupole errors on the dipole magnets, compensating its effects. Furthermore, optimized time-dependent settings for the sextupole magnets are generated to compensate the persistent current decay occurring at slow extraction. Tolerances for the magnets are set for the limits where the compensation is no longer valid.
Chopper systems are used to pulse charged particle beams. In most cases, electric deflection systems are used to generate beam pulses of defined lengths and appropriate repetition rates. At high beam intensities, the field distribution of the chopper system needs to be adapted precisely to the beam dynamics in order to avoid aberrations. An additional challenge is a robust design which guarantees reliable operation. For the Frankfurt Neutron Source FRANZ, an E×B chopper system is being developed which combines static magnetic deflection with a pulsed electric field in a Wien filter configuration. It will generate proton pulses with a flat top of 50 ns at a repetition rate of 250 kHz for 120 keV, 200 mA beams. For the electric deflection, pre-experiments with static and pulsed fields were performed using a helium ion beam. In pulsed mode operation, ion beams of different energies were deflected with voltages of up to ±6 kV and the resulting response was measured using a beam current transformer. A comparison between experiments and theoretical calculations as well as numerical simulations are presented.
A modern linear accelerator of ions is a long chain of different accelerating-focusing structures. The design of new linacs, as well as an upgrade and optimization of operating facilities, requires precise and reliable beam matching with the subsequent sections. Proper matching of the beam to the channel allows to improve the performance of the whole linac and to reduce the specific costs. Additionally it helps to avoide particle loss in high energy high intensity linacs. Generally a matching algorithm combines precisely measured or calculated accelerating-focusing external fields and experimentally obtained details of the beam parameters with an advanced code for beam dynamics simulations including space charge effects. Experimental results are introduced into a code as input data. The described algorithm has already been successfully implemented for several GSI projects: an upgrade of the GSI heavy ion linac UNILAC, an ion linac for the cancer therapy, the proton linac for the FAIR facility, a facility for laser acceleration of ions and others. Measured data and results of beam dynamics simulations leading to an achieved improvement of the linac performance are presented.
At GSI a new, superconducting (sc) continuous wave (cw) LINAC is under design in cooperation with the Institute for Applied Physics (IAP) of Frankfurt University and the Helmholtz Institut Mainz (HIM). This proposed LINAC is highly requested by a broad community of future users to fulfill the requirements of nuclear chemistry, nuclear physics, and especially in the research field of Super Heavy Elements (SHE). In this context the preliminary layout of the LINAC has been carried out by IAP. The main acceleration of up to 7.3 AMeV will be provided by nine sc Crossbar-H-mode (CH) cavities operated at 217 MHz. Currently, a prototype of the cw LINAC as a demonstrator is under development. The demonstrator comprises a sc CH-cavity embedded between two sc solenoids mounted in a horizontal cryomodule. A full performance test of the demonstrator in 2013/14 by injecting and accelerating a beam from the GSI High Charge Injector (HLI) is one important milestone of the project. The status of the demonstrator is presented.