Money distribution through scattergun approach does not buy real locational advantages
- The bridge electricity price planned by the Ministry of Economics to ease the burden on German industry manages the shortage instead of investing in energy infrastructure.
- Der vom Wirtschaftsministerium geplante Brückenstrompreis zur Entlastung der deutschen Industrie verwaltet den Mangel statt in die Energieinfrastruktur zu investieren.
Author: | Alfons J. WeichenriederORCiDGND |
---|---|
URN: | urn:nbn:de:hebis:30:3-710473 |
URL: | https://safe-frankfurt.de/news-latest/safe-finance-blog/details/money-distribution-through-scattergun-approach-does-not-buy-real-locational-advantages.html |
Parent Title (English): | SAFE Finance Blog |
Series (Serial Number): | SAFE Finance Blog (15.08.2023e) |
Publisher: | SAFE |
Place of publication: | Frankfurt am Main |
Document Type: | Part of Periodical |
Language: | English |
Date of Publication (online): | 2023/08/15 |
Date of first Publication: | 2023/08/15 |
Publishing Institution: | Universitätsbibliothek Johann Christian Senckenberg |
Release Date: | 2023/09/05 |
Tag: | Economic Reforms; Energy prices |
Volume: | 2023 |
Issue: | 15.08.2023 |
Page Number: | 3 |
Institutes: | Wirtschaftswissenschaften / Wirtschaftswissenschaften |
Wissenschaftliche Zentren und koordinierte Programme / Sustainable Architecture for Finance in Europe (SAFE) | |
Dewey Decimal Classification: | 3 Sozialwissenschaften / 33 Wirtschaft / 330 Wirtschaft |
Sammlungen: | Universitätspublikationen |
Licence (German): | Deutsches Urheberrecht |