Physik
Refine
Document Type
Language
- English (2)
Has Fulltext
- yes (2) (remove)
Is part of the Bibliography
- no (2)
Institute
- Physik (2)
Challenges of FAIR phase 0
(2018)
After two-year's shutdown, the GSI accelerators plus the latest addition of storage ring CRYRING, will be back into operation in 2018 as the FAIR phase 0 with the goal to fulfill the needs of scientific community and the FAIR accelerators and detector development. Even though GSI has been well known for its operation of a variety of ion beams ranging from proton up to uranium for multi research areas such as nuclear physics, astrophysics, biophysics, material science, the upcoming beam time faces a number of challenges in re-commissioning its existing circular accelerators with brand new control system and upgrade of beam instrumentations, as well as in rising failures of dated components and systems. The cycling synchrotron SIS18 has been undergoing a set of upgrade measures for fulfilling future FAIR operation, among which many measures will also be commissioned during the upcoming beam time. This paper presents the highlights of the challenges such as re-establishing the high intensity heavy ion operation as well as parallel operation mode for serving multi users. The status of preparation including commissioning results will also be reported.
The HITRAP linear decelerator currently being set up at GSI will provide slow, few keV/u highly charged ions for atomic physics experiments. The expected beam intensity is up to 105 ions per shot. To optimize phase and amplitude of the RF systems intensity, bunch length and kinetic energy of the particles need to be monitored. The bunch length that we need to fit is about 2 ns, which is typically measured by capacitive pickups. However, they do not work for the low beam intensities that we face. We investigated the bunch length with a fast CVD diamond detector working in single particle counting mode. Averaging over 8 shots yields a clear, regular picture of the bunched beam. Energy measurements by capacitive pickups are limited by the presence of intense primary and partially decelerated beam and hence make tuning of the IH-structure impossible. The energy of the decelerated fraction of the beam behind the first deceleration cavity was determined to about 10 % accuracy with a permanent dipole magnet combined with a MCP. Better detector calibration should help reaching the required 1%. Design of the detectors as well as the results of the measurements will be presented.